As the production planner for Xiangling Hu Products, Inc., you have been given a

ID: 334725 • Letter: A

Question

As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material for a bracket that is made up of a base, 2 springs, and 3 clamps. The base is assembled from 1 clamp and 1 housing. Each clamp has 1 handle and 1 casting Each housing has 1 bearing and 1 shaft. There is no inventory on hand a) Design a product slructure nating the quantities for each item and show the low level cading Match each number in the structure below with the corresponding m Bracket Number Item Springz) Il Housing1) Basc) II Caslng,) IV Shat) Clamp) Clamip1) b) Determine the grass quantities needed of each item if yau are to assembla 125 bracket:s

Explanation / Answer

Answer (a) :

The prodcut structure for the given bracket is as below with the individual quantities are mentioned along with the components as below.

Answer (b) : The gross quantities needed of components for making 125 bracket assemblies are as below .

The unit quantities requirement calculated for each item, based on the bill of material structure as shown below. Then unit quantity multiplied by the 125 numbers, to get the desired quanitity needed for each item to make 125 brackets.

Answer (c) :

If we have in stock 25 base and 100 clamps, then we need to make only 100 base, 250 springs and 275 clamps.  

Then as per billof material structure, wecalculated the exisiting stock for each item and the remaining item needed post subtraction from exisiting stock as below.

Bracket Base (1) Spring (2) Clamp (3) Clamp (1) Housing (1) Handle (1) Casting (1) Bearing (1) Shaft (1) Handle (1) Casting (1)