Academic Integrity: tutoring, explanations, and feedback — we don’t complete graded work or submit on a student’s behalf.

4. The following specification exists in a certain construction contract between

ID: 338158 • Letter: 4

Question

4. The following specification exists in a certain construction contract between Vinter Construction and the owner: Install drainage course on horizontal and vertical surfaces in accordance with the manufacturer’s recommendations. Contractor does not install in accordance with the manufacturer’s instructions and parts of the course fall down because there are not enough screws and braces to hold up the course. The contractor installed only about 1/3 of the manufacturer’s recommended screws and braces.

a. What type of specification is this?

b. Who is responsible for damage? Why?

Explanation / Answer

4. The following specification exists in a certain construction contract between Vinter Construction and the owner: Install drainage course on horizontal and vertical surfaces in accordance with the manufacturer’s recommendations. Contractor does not install in accordance with the manufacturer’s instructions and parts of the course fall down because there are not enough screws and braces to hold up the course. The contractor installed only about 1/3 of the manufacturer’s recommended screws and braces.

a. What type of specification is this?

b. Who is responsible for damage? Why?

Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
Chat Now And Get Quote