Exercise 7-7 Eric Parker has been studying his department\'s profitability repor
ID: 341257 • Letter: E
Question
Exercise 7-7 Eric Parker has been studying his department's profitability reports for the past six months. He has just completed a managerial accounting course and is beginning to question the company's approach to allocating overhead to products based on machine hours. The current department overhead budget of $920,520 is based on 43,500 machine hours. In an initial analysis of overhead costs, Eric has identified the following activity cost pool:s Cost Pool Product assembly Machine setup and calibration Product inspection Raw materials storage Expected Cost Expected Activities $387,150 320,950 126,380 86,040 920,520 43,500 Machine hours 2,450 setups 1,420 batches 478,000 pounds (a) Calculate the company's overhead rate based on machine hours (Round answer to 2 decimal places, e.g. 15.25.) Overhead rate $ / MH (b) Calculate the company's overhead rates using the proposed activity- based costing pools. (Round answers to 2 decimal places, e.g. 15.25.) Product assembly Machine setup and calibration$ Product inspection Raw materials storage / MH / setup / batchExplanation / Answer
Exercise 7-7 a Overhead rate = 920520/43500= $21.16 b Product assembly 8.9 =387150/43500 Machine setup and calibration 131 =320950/2450 Product inspection 89 =126380/1420 Raw materials storage 0.18 =86040/478000 Exercise 7-9 a Overhead rate = 995100/46000= $21.63 Total overhead allocated: Component 3F5 27254 =1260*21.63 Component T76 209811 =9700*21.63 b Activity rates: Product assembly 9.15 =420900/46000 Machine setup and calibration 112.67 =304200/2700 Product inspection 94 =124080/1320 Raw materials storage 0.24 =109920/458000 Component 3F5 Component T76 Product assembly 11529 88755 Machine setup and calibration 5070 2141 Product inspection 1880 940 Raw materials storage 2400 2400 Total overhead allocated 20879 94236
Related Questions
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.