One of the hardest things for schedulers to accept is the idea of visual scheduling, which is commonly referred to as Kanban scheduling. All of the schedulers earned degrees or have extensive experience in operations management and are used to terminology like order launch, schedule compliance, and shop floor control. In prior discussions with some of them, you told them, "These will all be gone soon."
-How does a Kanban system overcome this disadvantage? How exactly does a Kanban system of visual scheduling work?
Explanation / Answer
Solution:-
1. Kanban is a digital sign on boards which manages the flow of production by indicating the requirement for the components. Apart from the volume and the requirement for production, Kanban also helps in sequencing. Kanban can overcome the disadvantage of getting obsolete as it is based on a basic concept of scheduling the production based on physical or digital signalling and simple calculation of the requirement. Kanban drives down the costs and waste thus resulting in just in time manufacturing method.
2. Kanban system works based on the visual communication process where a depletion of inventory utilized in manufacturing is immediately communicated in the assembly line based on which the inventory is replenished thus avoiding the build-up of work-in-proces inventory and ensuring the production flow is smooth.