Question:1 The aim of value engineering is to Question:2 In time study, the rati
ID: 3551026 • Letter: Q
Question
Question:1
The aim of value engineering is to
Question:2
In time study, the rating factor is applied to determine
Question:3
Gantt chart is used for
Question4
The probabilistic time is given by (where to = Optimistic time, tp = Pessimistic time, and tn = Most likely time)
Question:1
The aim of value engineering is to
A. find the depreciation value of a machine B. determine the selling price of a product C. minimise the cost without change in quality of the product D. all of the aboveQuestion:2
In time study, the rating factor is applied to determine
A. standard time of a job B. merit rating of the worker C. fixation of incentive rate D. normal time of a workerQuestion:3
Gantt chart is used for
A. inventory control B. material handling C. production schedule D. machine repair schedules The aim of value engineering is to In time study, the rating factor is applied to determine Gantt chart is used for The probabilistic time is given by (where to = Optimistic time, tp = Pessimistic time, and tn = Most likely time)Explanation / Answer
Answer is C C D D
Related Questions
Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.