Knott\'s Industries manufactures standard and super premium backyard swing sets.

ID: 355231 • Letter: K

Question

Knott's Industries manufactures standard and super premium backyard swing sets. Currently it has four identical swing-set-making machines, which are operated 225 days per year and 8 hours each day. A capacity cushion of 15 percent is desired. The following information is also known: Annual Demand Standard Processing Time Average Lot Size Standard Setup Time per Lot 20,000 10 min 10,000 20 min 35 45 min 30 min a. Does Knott's have sufficient capacity to meet annual demand? Knott's ? have sufficient capacity o meet annual demand because machines are needed. Enter your response rounded the next whole number.

Explanation / Answer

KNOTT

Number of setups required per year =Annual demand/ average lot size

Total setup time required, per year = Number of setups required per year * standard setup time per lot

Total processing time required, per year = Annual demand* standard processing time for 1 unit

standard model

super premium model

Annual demand

20000

10000

standard processing time for 1 unit

10min=10/60=0.167 hours

20 min=20/60=0.33 hrs

average lot size

55

35

standard setup time per lot

30 min= 30/60=0.5hrs

45min=45/60=0.25 hrs

Number of setups required per year

=20000/55=363.33 setups per year

= 10000/35 =285.71 setups per year

Total setup time required

=363.33* 0.5= 181.81 hrs per year

= 285.71* 0.25 = 71.43 hrs per year

Total processing time required

= 0.167*20000 = 3340 hrs per year

=0.33*10000= 3300 hrs per year

Total setup time required for both models      

=181.81+71.43= 253.24 hrs per year

Total processing time required for both models

= 3340+3000=6340 hrs per year

Cushion rate,C= 15%

Hours available from a single capacity (machine) unit per year,N               

=225*8= 1800 hours per year         

Hours available from a single capacity (machine) unit per year after deducting cushion        

=N / [1-(C/100)]

=1800(1-(15/100)) =1530 hours per year    

Capacity requirement       

=Total time (setup +processing time) required to meet annual demand, for all products and services /               Hours available from a single capacity (machine) unit per year after deducting cushion            

= (253.24+6340)/1530=4.31 machines       (or 5 machines)

Required capacity is more than the available capacity

Answer

Knott does not have sufficient capacity because 5 machines are required

standard model

super premium model

Annual demand

20000

10000

standard processing time for 1 unit

10min=10/60=0.167 hours

20 min=20/60=0.33 hrs

average lot size

55

35

standard setup time per lot

30 min= 30/60=0.5hrs

45min=45/60=0.25 hrs

Number of setups required per year

=20000/55=363.33 setups per year

= 10000/35 =285.71 setups per year

Total setup time required

=363.33* 0.5= 181.81 hrs per year

= 285.71* 0.25 = 71.43 hrs per year

Total processing time required

= 0.167*20000 = 3340 hrs per year

=0.33*10000= 3300 hrs per year