Background: Susan finished work on system architecture issues, and her system design specifications was approved. Now she is ready to address system implementation tasks, including quality assurance, structure charts, testing, training, data conversion, system changeover, and post-implementation evaluation.
Taken from Systems analysis and Design, 10th ed, Rosenblatt. Pgs 496-497
Task 1: Plan the testing required for the system. You should consider unit, integration, and system testing in your test plan and determine who should participate in the testing.
Explanation / Answer
Dear user,
Task1:
Testing required for the system
The planning of the testing includes unit test, integration test and system testing.
Participation in testing:
The computer program users of the company should contribute to the testing methods, particularly who is the office manager, allows them to be train on all the functions of the system.