Create a data collection sheet for conducting a time study of the process of \"m
ID: 360358 • Letter: C
Question
Create a data collection sheet for conducting a time study of the process of "making of a Peanut Butter and Jelly" Sandwich. You need to take into account the set-up period, making the sandwiches, and the break-down period. Consider that you are making a batch of 20 sandwiches and all the sandwiches will be wrapped in a napkin and placed in a plastic sandwich bag. Set-up is getting all the supplies ready to make the sandwiches and breakdown is putting away all the supplies and washing any utensils. You need to be able to determine a standard time per sandwich. In addition, you want to be able to answer the questions below. Finally, describe whether this is a continuous or a snapback time study and why you chose that. How long is setup? b. How long is breakdown? c. a. How long does it take to make a sandwich? d. How long does it take to wrap the sandwich? e. What is the overall time per sandwich not including set-up and breakdown? 2. Create a data collection sheet for conducting a time study of the process of depositing and/or withdrawing money from the bank. You need to include the option of going in the bank to see a teller personally, using the ATM machine at the bank, or using the Drive Thru. The process should start with arriving at the bank parking lot and it ends with completing the transaction with teller or ATM. You want to be able to determine a standard time for the items below. Finally, describe whether this is a continuous or a snapback time study and why you chose that. Depositing at a teller b. a. Withdrawing at a teller Depositing at an ATM c. d. Withdrawing at an ATM Depositing at a Drive-thru teller f. Withdrawing at a Drive-thru teller g. Wait time for a teller h. Wait time for an ATM i. Wait time for the Drive-thruExplanation / Answer
Answer
1)
The Set up is 10 mins excluding procurement , and 40 mins including procurement
Breakdown time (nil / not applicable in this scenario, its inclusive of the set up)
Time taken to make one sandwich is 2 mins
Time Taken to Wrap the sandwich = (Total Packaging Time) / (Total Number of Sandwiches) = 5 Mins / 40 = 0.125 Mins or 7.5 Seconds per sandwich
Over All Time Excluding set up and break down = 50 Mins
Task Time Taken Unit Procurement Time for 2 Loves of Bread 5 Mins Procurement Time for 2 Jars of Peanut Butter 5 Mins Procurement Time for one disposable knife, cloth and packaging 5 Mins TO and Fro Drive to the super market to pick up supplies 15 Mins Time taken for setting up the kitchen to put the sandwiches together 10 Mins Average Time Per Sandwich (2 Slices) (2mins per sandwich) 40 Mins Packaging Time 5 Mins Cleaning the kitchen and the utensils 5 Mins Total Amount of Time Taken 90 MinsRelated Questions
Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.