A supplier of instrument gauge clusters uses a kanban system to control material
ID: 366626 • Letter: A
Question
A supplier of instrument gauge clusters uses a kanban system to control material flow. The gauge cluster housings are transported three at a time. A fabrication center produces approximately 3 gauges per hour. It takes approximately three hours for the housing to be replenished. Due to variations in processing times, management has decided to keep 3 percent of the needed inventory as safety stock. How many kanban card sets are needed? (Round up your answer to the next whole number.)
A bottling plant fills 2,400 bottles every two hours. The lead time is 40 minutes and a container accommodates 120 bottles. The safety stock is 10 percent of expected demand. How many kanban cards are needed? (Round up your answer to the next whole number.)
Explanation / Answer
D= 3 gauges per hour
L= 3 hours
S= 0.03
C= 3 gauges
K= D*L*(1+S)/C
= 3*3*(1+0.03)/3
= 3.09 OR 3 kanban card sets
D= 2400/2 hours or 1200/hour or 20/minute
L=40
S=0.1
C=120
K= D*L*(1+S)/C
= 20*40*(1+0.10)/120
=7.33 OR 8 KANBAN CARDS