1) In a parallel installation strategy a) old system is phased out after the new
ID: 368302 • Letter: 1
Question
1) In a parallel installation strategy
a) old system is phased out after the new system is proven
b) old system is phased out gradually after the new system is introduced
c) old system is phased out right after the new system is introduced
d) old system is phased out before the new system is introduced
2) Action plans may include:
a) names of responsible personnel who caused the problems
b) expected completion date
c) proposed solutions for the problems
d) problem area
e) names of responsible personnel assigned to actions
Explanation / Answer
1.In a parallel installation strategy, both old systems and new systems are run by the organization till they make sure that the new system is working properly. Once the new system is proved they switch completely to the new system.
Hence the answer is option a, old system is phased out after the new system is proven
2. Action plans may include the specific actions to be completed, the time period for achieving goal and the resource allocated. The action plan should not be open ended and the completion date should be clearly written in the action plan.
Hence the answer is option b, expected completion date.