Question 6 (10 points) Before lean production system, traditional management had

ID: 370183 • Letter: Q

Question

Question 6 (10 points) Before lean production system, traditional management had the luxury of having stored capacity in the form of inventory that required "real-time management that is not as forecast driven as the new lean systerns. O False Question 7 (10 points) Which of the following is/are better handled by kanban than MRP? (mark all that apply) A) Capacity planning O B) Inventory reduction c) Execution of plans Question 8 (10 points) Holding cost is related to equipment setup, and a major JIT effort is to reduce holding cost. False Save MacBook Air FS F8 F9 F1O

Explanation / Answer

6. True

7. D. Final Assembly Schedules- rest are done by MRP.

8. False. Holding cost is related to holding inventory, not equipment setup.

9. False- Kanban cards signal step in manufacturing process. They generally help improve process. Removing them won't add value. (Not sure if the question means to say that "Kanban Cards has something which will bring to surface the issues'" or "removing the Kanban cards will bring forth the issue".

10. c. paperwork is not a muda as per lean

10.