The process of determining the likelihood and severity of a hazard leads to a determination of the level of safety risk which is also called the:

Answer: Safety risk

The process of determining the level of safety risk of a hazard is called:

Answer: Risk Assessment

ICAO proposes a combination of three methods be used to identify hazards. What are they?

Answer: Reactive, Proactive, and Predictive

Rank the following in order from most to least effective in controlling hazards

Answer:

1 = most effective and 5 = least effective

Provide Safety Devices: 1 (it provides engineering control)

Provide Safety Procedures: 3

Eliminate the Hazard: 1

Provide Warnings or Advisories: 4

Reduce the Hazard Level: 2 (occurrence is not reduced)

Explanation / Answer

List the inadequacies of the hazard identification process