The process of determining the likelihood and severity of a hazard leads to a de
ID: 373389 • Letter: T
Question
The process of determining the likelihood and severity of a hazard leads to a determination of the level of safety risk which is also called the:
Answer: Safety risk
The process of determining the level of safety risk of a hazard is called:
Answer: Risk Assessment
ICAO proposes a combination of three methods be used to identify hazards. What are they?
Answer: Reactive, Proactive, and Predictive
Rank the following in order from most to least effective in controlling hazards
Answer:
1 = most effective and 5 = least effective
Provide Safety Devices: 1 (it provides engineering control)
Provide Safety Procedures: 3
Eliminate the Hazard: 1
Provide Warnings or Advisories: 4
Reduce the Hazard Level: 2 (occurrence is not reduced)
Explanation / Answer
List the inadequacies of the hazard identification process