QUESTION 6 Goal of path testing is to ensure that the full path from input to ou
ID: 3741162 • Letter: Q
Question
QUESTION 6
Goal of path testing is to ensure that
the full path from input to output is fully analyzed
all the code segments except the loops are tested
all user scenarios are tested
all code segments are tested at least once
4 points
QUESTION 7
RTOS stands for
Real-Time Operating System
Reliable Timed Operating System
Rotation Timed Operating System
Redundancy Two Operating System
4 points
QUESTION 8
If a system processes all the incoming requests and responds correctly, it is said to have 100%
availability
safety
security
reliability
4 points
QUESTION 9
Which item does not belong to the test plan document?
testing schedule
test items
Bug reports
user requirements
the full path from input to output is fully analyzed
all the code segments except the loops are tested
all user scenarios are tested
all code segments are tested at least once
Explanation / Answer
1)
all user scenarios are tested
the full path from input to output is fully analyzed
2)
Real-Time Operating System
3)
reliability
4) user requirements
because user requirements are part of requirements understanding
and testing schedule , test items , Bug reports are esssential part of test plan document
Related Questions
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.