As the production planner for Xiangling Hu Products, Inc., you have bean given a bil of material for a bracket that is made up of a base, 1 spring, and 4 clamps. The base is assombled from 1 clamp and 1 housing Each dlamp has 1 handle and 1 casting. Each houning has 1 bearing and 1 shaft. There is no inventory on hand This exercise contains only parts b and c The product structure is as follows Bracket Base Spring Clan ) Handley Casting BearinShaf dleCasting) Determine the gross quanities needed of each item if you are to assemble 125 brackets rts units (enter your response as a whole number) Base, Sona units (ontor vourresponse as . wholo number.

Explanation / Answer

Please find below the filled up tables as required :

Number of brackets required = 125

ITEM

CALCULATION

QUANTITY NEEDED

BASE

125 X 1

125

SPRING

125 x 1

125

CLAMP

125 X ( 1 + 4 )

625

HOUSING

125 X 1

125

HANDLE

625 X 1

625

CASTING

625 X 1

625

BEARING

125 X 1

125

SHAFT

125 X 1

125

Number of Brackets required = 125

Items in stock :

Base = 25

Clamp = 100

ITEM

CALCULATION FOR BROSS REQUIREMENT

NET REQUIREMENT

BASE

125 X 1 - 25

100

SPRING

125 x 1

125

CLAMP

1 X 100 + 4 X 125 - 100

500

HOUSING

100 X 1

100

HANDLE

500 X 1

500

CASTING

500 X 1

500

BEARING

100 X 1

100

SHAFT

100 X 1

100

ITEM

CALCULATION

QUANTITY NEEDED

BASE

125 X 1

125

SPRING

125 x 1

125

CLAMP

125 X ( 1 + 4 )

625

HOUSING

125 X 1

125

HANDLE

625 X 1

625

CASTING

625 X 1

625

BEARING

125 X 1

125

SHAFT

125 X 1

125