The following data have been collected for a British health care IT project for

ID: 382039 • Letter: T

Question

The following data have been collected for a British health care IT project for two-week reporting periods 2 through 12. Compute the SV, CV, SPI, CPI , and PCIB for each period.

4 2 12 14 7 18 6 8 14 | 14 | 4 | 181 4 3 10 10 5 14 18 822 0 4 4 4 6 10 10 4 14 18 4 22 ES ID EF SL LS 8 6 16 SL 6 4 10 10 8 18 Baseline (PV) (s00) Task DUR ES LF SL 2 4 6 8 10 12 14 16 18 20 4 8 4 4 10 | 10 | 10 | 10 10 15 5 10 10 2 2 40 0 30 2 20 0 40 2 60 0 20 4 18 22 0 30 4 4 4 10 14 10 4 4 10 20 20 18 20 20 10 10 14 18 10 10 20 10 Period PV tota 4 430 35 35 50 30 20 1020 10 Cumulative PV total 4 8 38 73 108 158 188 208 218 238 248 (Do not round intermediate calculations. Enter all values to 2 decimal precision. For SPI, CPI, and PC-B, enter in decimals rather than percentage format. (i.e., enter 0.93 if the answer is 93%)) End of Period 2 Task Actual % Complete EV AC PV CV SV 4.00 CumulativeTotals

Explanation / Answer

Following formulas are used to compute the various performance parameters

Status at end of period 12

Formula: EV = % Complete * Budget of task PV = Cumulative sum of activity cost until the end of period. BAC = Total budget of project at completion PCI-B = EV/BAC CV = EV - AC SV = EV - PV SPI = EV/PV CPI = EV/AC EAC = AC + (BAC-EV)/CPI VAC = BAC - EAC