You are constructing X-bar (means) and Range charts for a process for which you
ID: 382931 • Letter: Y
Question
You are constructing X-bar (means) and Range charts for a process for which you do not know the natural variability. You have collected samples of 5 readings over the past 15 days. The x-bar-bar (grand mean, average of averages) is 150 and the average range is 20.
Please show your work. Thank you.
You are constructing X-bar (means) and Range charts for a process for which you do not know the natural variability. You have collected samples of 5 readings over the past 15 days. The x-bar-bar (grand mean, average of averages) is 150 and the average range is 20 Using the table of control factors Factors for R-Chart D3 Factor for X-Chart Sample Size n 1.88 1.02 0.73 0.58 0.48 0.42 0.37 0.34 0.31 0.29 0.27 0.25 0.24 0.22 0.08 0.14 0.18 0.22 0.26 0.28 0.31 0.33 0.35 3.27 2.57 2.28 2.11 2.00 1.92 1.86 1.82 1.78 1.74 1.72 1.69 1.67 1.65 10 12 13 15 The UCL for the Range chart will be: Express with 1 decimal placeExplanation / Answer
To be calculated:
UCL for the Range Chart
Given Values:
X-bar-bar (or Grand Mean) = 150
R-bar (or Average Range) = 20
Number of Samples = 5
Solution:
UCL for the range chart can be calculated as;
UCL = X-bar-bar + (A2 x Range-bar)
From the given table of control factors, we can observe that;
For (n = 5), A2 = 0.58
Putting all the values in the above formula, we get;
UCL = 150 + (0.58 x 20)
UCL = 161.6
The UCL for the range chart is 161.6
Related Questions
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.