Needing the answers to Part A, C, D, and F Consider a process consisting of three resources. Assume there exists unlimited demand for the product. Resource 1 has a processing time of 4 minutes per unit. Resource 2 has a processing time of 3 minutes per unit. Resource 3 has a processing time of 2 minutes per unit. All three resources are staffed by one worker and each worker gets paid $11 per hour Instruction: "Round "cost of direct labor" and "target manpower" to 2 decimal places. Round 'average labor utilization" percent and "takt time" to 2 decimal places a. What is the cost of direct labor? S 1.65 per unit b. What is the labor content? 9minutes per unit How much idle time does the worker at resource 3 have per unit? C. 7 minutes per unit d. What is the average labor utilization? 45.00 percent Assume the demand rate is 15 units per hour. What is the takt time? minutes per unit Assume the demand rate is 15 units per hour. What is the target manpower? 3.00 minutes per unit

Explanation / Answer

The bottleneck activity with maximum time taken is Resource 1 with 4 minutes.

Since Process Capacity is decided by the bottleneck activity, therefore the process capacity is 4 minutes per unit i.e. 60/4 = 15units per hour

Total salary paid in 1 hour

= Hourly wage per worker per resource x Number of resources

= $11 x 3 = $33

Hence cost of direct labor

= Total wage paid in 1 hour/ Hourly capacity of the process

= $33 / 15

= $2.2

COST OF DIRECT LABOR = $2.2 PER UNIT

Labor content = Total time taken in 3 resources = 4 + 3 +2 minutes = 9 minutes

LABOR CONTENT = 9 MINUTES PER UNIT

Cycle time of the process = Processing time of the bottleneck activity = 4 minutes / unit

Processing time at Resource 3 = 2 minutes / unit

Thus , Idle time at Resource 3 = Process cycle time – Processing time at Resource 3 = 4 – 2 = 2 minutes

IDLE TIME WORKER AT RESOURCE 3 HAS IS 2 MINUTES PER UNIT

Average Labor utilization

= Total processing time at 3 resources / ( Number of resources x Cycle time ) x 100

= ( 4 + 3 +2 ) / ( 3 x 4) x 100

= 9/12 x 100

= 75 %

AVERAGE LABOR UTILIZATION = 75 %

Takt time = Available time / Corresponding demand = 60 minutes/ 15 units = 4 minutes/ unit

TAKT TIME = 4 MINUTES/ UNIT

Target manpower = 60 minutes/ 15 units = 4 minutes/ unit

TARGET MANPOWER = 4 MINUTES / UNIT

COST OF DIRECT LABOR = $2.2 PER UNIT