Question
___Design for Change A. States focus of agile methods ___Code of Ethics B. COTS ____SCRUM C. Paired programming ___Waterfall Model D. Precept of traditional SW engineering ____Client E. Incremental Development ____Document F. Spike ___Software Engineering G. 2-4 week sprints ____Feasibility Study H. SW Process _____Microsoft Visual Studio I. Stakeholder ____Use to understand requirements J. Prototyping _____Agile Manafesto K. For change _____No programming is done L. Behavior Standards ____XP M. A main activity in the requirements engineering process ____Set of Activities N. Use when requirements are well understood and will not change radically ____Development process not visible O. Concerned with all aspects of software productionExplanation / Answer
Answer:-
1.design for change - For Change
2.Code of ethics - Behaviour standard
3.SCRUM - 2-4 week sprint
4.Waterfall model - percept of traditional software engineering
5.Client - Stakeholder
6.Document - use when requirements are well understood and will not chnage radically
7.software Engineering - SW Process
8.Feasibility study - A main activity in the requirement engineering process.
9.Microsoft Visual Studio - COTS
10.Use to understand requirement - Spike
11.Agile Manifesto - States focus of agile method.
12.No programming is done - Prototyping
13.XP - Paired programming
14.Set of activities - concerned with all the aspects of software production.
15.Development process not visible - Incremental development