A Missouri job shop has four departments-machining (M), dipping in a chemical bath (D), finishing (F), and plating (P-assigned to four work areas. The operations manager, Mary Marrs, has gathered the following data for the movement of material. ng The number of workpieces moved yearly between work areas ane 00 1,900 400 D_-500 200 2,000 It costs $0.50 to move 1 workpiece 1 foot in the job shop. For the layout design of the job shop, Mary has the current layout (Plan A) and two proposals (Plan B and Plan C) a) LAYOUT PLAN A: Distance between work areas (departments) in feet: 22 12 8 6 10

Explanation / Answer

Solution:

The yearly total material handling cost is calculated as,

Material handling cost = (Number of workpieces moved yearly x Distance between work areas) x Cost of moving 1 workpiece 1 foot

(a) Layout Plan A:

Material handling cost = [(700 x 22) + (1900 x 12) + (400 x 8) + (500 x 6) + (200 x 10) + (2000 x 4)] x $0.50

Material handling cost = $27,200

(b) Layout Plan B:

Material handling cost = [(700 x 22) + (1900 x 8) + (400 x 12) + (500 x 10) + (200 x 6) + (2000 x 4)] x $0.50

Material handling cost = $24,800

(c) Layout Plan C:

Material handling cost = [(700 x 22) + (1900 x 10) + (400 x 6) + (500 x 8) + (200 x 12) + (2000 x 4)] x $0.50

Material handling cost = $25,600

(d) The best layout from the cost perspective is PLAN B.