Atlas Inc. is a toy bicycle manufacturing company producing a five-inch small version of the bike that Lance Armstrong rode to win his first Tour de France. The assemblyline at Atlas Inc. consists of seven work stations, each performing a single step. Stations and processing times are summarized here Step 1 (30 sec.): The plastic tube for the frame is cut to size Step 2 (20 sec): The tube is put together Step 3 (35 sec.): The frame is glued together Step 4 (25 sec.): The frame is cleaned Step 5 (30 sec.): Paint is sprayed onto the frame Step 6 (45 sec.): Wheels are assembled Step 7 (40 sec.): All other parts are assembled to the framee Under the current process layout, workers are allocated to the stations as shown here Worker 1: Steps 1, 2 Worker 2: Steps 3, 4 Worker 3: Step 5 Worker 4: Step 6 Worker 5: Step 7 Assume the workers are paid $15 per hour. Each bicycle is sold for $6 and includes parts that are sourced for $1. The company has fixed costs of $200 per hour Despite Lance Armstrong's doping confession, there exists substantially more demand for the bicycle than Atlas can supply Instructions: Carry at least 4 decimal places in all intermediate calculations and values. Round (only) your final answers to 2 decimal places. Negative amounts should be indicated by a minus sign What is the cost of direct labor for the bicycle? per unit How much profit does the company make per hour? per hour What would be the profits per hour if Atlas would be able to source the , parts 10% cheaper ($0.90 for the per hour parts of one unit, but the fixed costs and productivity will remain same as before)? What would be the profits per hour if d. Atlas would be able to reduce fixed per hour costs by 10% (to $180.00 per hour)? What would be the profits per hour if Atlas would be able to reduce the processing time at the bottleneck by 5 seconds per unit (assume unlimitedExplanation / Answer
Following are the processing time for each process :
Process consisting of step 1 and step 2 : 30 + 20 = 50 seconds
Process consisting of step 3 and step 4 : 35 + 25 = 60 seconds
Process consisting of step 5 : 30 seconds
Process consisting of step 6 : 45 seconds
Process consisting of step 7 : 40 seconds
Out of above, the process consisting of step 3 + step 4 has the longest processing time and hence should be considered as bottleneck process of the system.
Since , processing capacity of the system will be determined by capacity of the bottleneck process, system process capacity will be 60 seconds/ bike
Therefore, hourly capacity of the system = 3600 seconds/ 60 seconds = 60 units
Total hourly wages paid to the 5 workers = $15 / worker x 5 workers = $75
Therefore , cost of direct labour for the bicycle = $75 / 60 unit = $1.25 / unit
Hourly profit of the company
= Price/ unit x Number of units sold per hour – Sourcing cost / unit x Number of units sold per hour – Total hourly wages paid to 5 workers – Fixed cost per hour
= $60 x 60 - $1 x 60 - $75 - $200
= $360 - $60 - $75 - $200
= $25
Revised sourcing cost = $0.90 / unit
Revised hourly profit for the company
= = Price/ unit x Number of units sold per hour – Sourcing cost / unit x Number of units sold per hour – Total hourly wages paid to 5 workers – Fixed cost per hour
= $6 x 60 - $0.90 x 60 - $75 - $200
= $360 - $54 - $75 - $200
= $31
Revised fixed cost = $180
Revised hourly profit for the company
= Price/ unit x Number of units sold per hour – Sourcing cost / unit x Number of units sold per hour – Total hourly wages paid to 5 workers – Fixed cost per hour
= $6 x 60 – $1 x 60 - $75 - $180
= $360 - $60 - $75 - $180
= $45
If the processing time at the bottleneck ( step 3 + step 4 ) reduces by 5 seconds, processing time at bottleneck will become 55 seconds. However, still it will be the bottleneck process by virtue of having the highest processing time .
The revised capacity of the system will be = 55 seconds/ bike
Hourly capacity of the system = 3600 / 55 = 65.45 units
Revised hourly profit for the company with hourly capacity of 65.45 units
= Price/ unit x Number of units sold per hour – Sourcing cost / unit x Number of units sold per hour – Total hourly wages paid to 5 workers – Fixed cost per hour
= $6x 65.45 - $1 x 65.45 - $75 - $200
= $392.70 - $65.45 - $75 - $200
= $52.25
d.Profit per hour for the company with reduction in fixed cost = $45
Profit per hour for the company with reduction in processing time at the bottleneck =$52.25
- Cost of direct labour for the unit = $1.25