Layout (revised) A car manufacturer is planning to install an assembly line for
ID: 399433 • Letter: L
Question
Layout (revised)
A car manufacturer is planning to install an assembly line for a new model of car, and the engineering team has been asked to balance the process, given the following task times and precedence relationships. Assume a 600-minute working day and a desired output rate of 50 cars per day.
3. Assign the tasks to workstations according to the greatest number of following tasks. In case of a
tie, use the tiebreaker of assigning the task with the longest processing time rst. [12 marks]
4. Draw the product layout for the car assembly process based on the task assignment results. [3
marks]
5. Determine the percentage of idle time and hence the e¢ ciency of the product layout. [5 marks]
Thanks very much
Task Time (minutes) Immediate Followers a 4 b,c b 6 d c 3 f d 3 e e 2 g f 10 e g 8 h h 4 -Explanation / Answer
Given the data is as follows
Assume a 600-minute working day and a desired output rate of 50 cars per day
Calculating Cycle Time
Cycle Time = (production time per day) / (output per day)
Cycle Time = (600) / (50) = 12 min
Calculating theoretical Minimum Number of workstations
Minimum number of work station = (Sum of total Task Time) / (cycle time)
Minimum number of workstation = 40 / 12 = 3.33 = 3 workstation rounded off
Efficiency of the Line Balance
Efficiency of line balance = (Sum of All task time) / ((Actual number of work station) x (Cycle time))
Efficiency = 40 / (3*12) = 1.11
Sequential Relationship among tasks and predecessor diagram
Please note given data have issues as the effeciency is higher than 100% please recheck the data to do the line balancing again
Please note given data have issues as the effeciency is higher than 100% please recheck the data to do the line balancing again
Station Eligible task Assigned task task time (min) Cumulative time (min) Idle Time (Min) 1 a a 4 4 8 2 b,c b 6 6 6 2 c,d c 3 9 3 2 d,f,e d 3 12 0 3 f,e f 10 10 2 3 e e 2 12 0Related Questions