1)Bill of material errors can cause serious problems for MRP system calculations

ID: 402714 • Letter: 1

Question

1)Bill of material errors can cause serious problems for MRP system calculations of dependant demands T/F 2)No matter what forecasting technique is used, the probability of a production forecast being exactly correct is almost zero. T/F 3)Computerized MRP systems automatically optimize material flow through a production system. T/F 4)The Toyota Production System uses MRP to control flow of materials from suppliers to the assembly process. T/F 5)Just in Time, the Toyota Production System and Lean Manufacturing are basically the same thing. T/F 6)Low inventory turns is always an indicator of a problem with the MRP systems calculations. T/F 7)The main reason to use Kanbans is to relieve bottleneck conditions. T/F 8)Pull systems are always designed to use the theory of constraints to maximize efficiency. T/F 9)The main idea of the theory of constraints is to provide the exact capacity necessary for all processes in a system. T/F 10)The objective of value stream mapping is to improve the data used by the MRP System. T/F
Please try to give the correct answer. Don't play with this questions! Thanks 1)Bill of material errors can cause serious problems for MRP system calculations of dependant demands T/F 2)No matter what forecasting technique is used, the probability of a production forecast being exactly correct is almost zero. T/F 3)Computerized MRP systems automatically optimize material flow through a production system. T/F 4)The Toyota Production System uses MRP to control flow of materials from suppliers to the assembly process. T/F 5)Just in Time, the Toyota Production System and Lean Manufacturing are basically the same thing. T/F 6)Low inventory turns is always an indicator of a problem with the MRP systems calculations. T/F 7)The main reason to use Kanbans is to relieve bottleneck conditions. T/F 8)Pull systems are always designed to use the theory of constraints to maximize efficiency. T/F 9)The main idea of the theory of constraints is to provide the exact capacity necessary for all processes in a system. T/F 10)The objective of value stream mapping is to improve the data used by the MRP System. T/F
Please try to give the correct answer. Don't play with this questions! Thanks

Explanation / Answer

1. t

2. f

3. t

4. t

5. f

6. f

7. t

8. t

9. t

10. f