Answer all questions to the best of your ability. If you are not sure how to answer;a question, make an attempt to address the question to the best of your ability, so you may be eligible for partial credit. On conceptual questions, be specific and clear in your responses. (i.e. If you claim that some technology or management approach leads to faster project delivery, you will need to explain how or why this is the case for full credit.) When a question asks for you to define a plan of action or recommendation for resolving a construction challenge, be sure to communicate your answer in a manner that addresses the criteria in S.M.AR.T. (Specific, Measurable, Assignable, Realistic, and Time-bound). Answers that are not fully explained will not receive full credit. Also, be sure to cite any sources that you reference to back up your response:s to questions. Use an accepted citation format for this. Finally, you are expected to do your own work in developing responses to this quiz. You should not consult with others in the class as you develop your responses. Submissions must be in Word (.DOCX or .DOC) format and will be checked through a plagiarism detection tool. If any responses are found to be copied in part or in full from another students' work or from any other source and citation credit is not given, this will be treated as a violation of academic integrity. In these circumstance:s students will be penalized on their grade and they will also be reported to ASU's office for academic integrity (4 Points) within the context of our course, what does "B.LM." stand for(we discussed multiple interpretations of BIM, so you may choose one)? How is this interpretation of BIM different from traditional CAD? Provide 2 distinct differences between BIM and CAD 1· a. (O Points, but plausible response required for credit on question) b. How is this interpretation of BIM different from CAD? i. (2 Points) Difference 1: ii (2 Points) Difference 2:Explanation / Answer
a. BIM is an acronym for Building Information Modelling or Building Information Model. It describes the process of designing a building collaboratively using one coherent system of computer models rather than as separate sets of drawings.
b. 1. The predecessor to CAD for designing buildings was paper, and as the name states, the technology allows users to design with computers rather than what was used previously.
BIM is a process for working collaboratively in designing and building from one utilized database and model. BIM offers a real representation, digitally, of a facility and it’s systems. These systems include HVAC, electrical and aesthetics like walls, roofs and windows.
2. CAD can be used to produce 2 or 3-dimensional models of parts, materials or buildings. It is used in many industries today for drafting or creating digital conceptions.
BIM is an incredibly powerful tool that can be used to update and create floor plans. BIM allows you to integrate space, asset and construction information in the same program.