Academic Integrity: tutoring, explanations, and feedback — we don’t complete graded work or submit on a student’s behalf.

Great Southern Consultants Group\'s computer system has been down several times

ID: 430462 • Letter: G

Question

Great Southern Consultants Group's computer system has been down several times over the past few months, as shown below. Number of breakdowns 0 1 2 3 4 Monthly frequency 10 1 4 4 1 Each time the system is down, the firm loses an average of $500 in time and service expenses. They are considering signing a contract for preventive maintenance. With preventive maintenance, the system would be down on average only 0.5 per month. The monthly cost of preventive maintenance would be $300 a month. Which is cheaper, breakdown or preventive maintenance?

Explanation / Answer

Number of breakdowns

0

1

2

3

4

Monthly frequency

10

1

4

4

1

Monthly probability

10*0.05=0.5

1*0.05=0.05

4*0.05=0.2

4*0.05=0.2

1*0.05=0.05

Expected number of breakdowns per month = 0*0.5 +1*0.05 + 2*0.2 + 3*0.2+4*0.05 =1.25

Expected cost of breakdown per month =1.25*$500 =$625

Preventive maintenance cost per month -0.5*$500+$300 =$550

Thus from above, it is clear that Preventive maintenance is cost-effective.

I REQUEST YOU TO KINDLY RATE THE ANSWER AS THUMBS UP. THANKS A LOT.

Number of breakdowns

0

1

2

3

4

Monthly frequency

10

1

4

4

1

Monthly probability

10*0.05=0.5

1*0.05=0.05

4*0.05=0.2

4*0.05=0.2

1*0.05=0.05