The High Altitude Ski Company manufactures skis in the finishing and assembly pr

ID: 451906 • Letter: T

Question

The High Altitude Ski Company manufactures skis in the finishing and assembly process. Skis are manufactured in 40-ski batch sizes. The finishing time is 5 minutes per ski. The assembly time is 9 minutes per ski. It takes 12 minutes to move a batch of skis from finishing to assembly.

a. Compute the value-added, non-value-added, and total lead time of this process.

b. Compute the value-added ratio. Round to one decimal place.
%

Value-added lead time minutes Non-value-added lead time minutes Total lead time minutes

Explanation / Answer

a) Value-added lead time = 14 min (5 min + 9min)

non-value-added lead time:

Total with in batch wait time = (5 min + 9min) *(40-1)

= 546 min

Move time = 12 mins

Total lead time = 546 + 12 = 558mins

b) Value-added ratio = Value added lead time/ Total lead time

= 14/558

= 0.025 = 2.5%