8. (TCO 3) Which of the following are elements that address elimination of waste
ID: 457153 • Letter: 8
Question
8. (TCO 3) Which of the following are elements that address elimination of waste under lean production? (Points : 3) Production ahead of demandGroup plant loading technology
Kanban production control system
Minimized run times
Full capacity utilization Question 9.9. (TCO 3) Which of the following statements holds true for Kanban production control systems? (Points : 3) The authority to produce or supply additional parts comes from upstream operations.
In a paperless control system, containers can be used instead of cards.
The cards or containers make up the Kanban push system.
They require substantial quantitative analysis prior to implementation.
They have not been successful outside of Japan and the United States. Question 10.10. (TCO 3) To implement lean production schedules, a firm would do which of the following? (Points : 3) Have excess capacity
Force demand
Hire a consultant
Bottom-up management
Implement Kanban groups 8. (TCO 3) Which of the following are elements that address elimination of waste under lean production? (Points : 3) Production ahead of demand
Group plant loading technology
Kanban production control system
Minimized run times
Full capacity utilization
Explanation / Answer
8. Kanban production control system
9. In a paperless control system, containers can be used instead of cards.
10. Have excess capacity
Related Questions
Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.