Transmissions are delivered to the fabrication line five at a time. It takes two
ID: 458902 • Letter: T
Question
Transmissions are delivered to the fabrication line five at a time. It takes two hours for transmissions to be delivered. Approximately three vehicles are produced each hour, and management has decided that 50 percent of expected demand should be maintained as safety stock. How many kanban card sets are needed?
[5*2(1+50%)]/3 = 5 is not the right answer?
Transmissions are delivered to the fabrication line five at a time. It takes two hours for transmissions to be delivered. Approximately three vehicles are produced each hour, and management has decided that 50 percent of expected demand should be maintained as safety stock. How many kanban card sets are needed?
[5*2(1+50%)]/3 = 5 is not the right answer?
Explanation / Answer
Given Demand D = 5
Safety stock S = 50% =0.5
Lead time = 2 hours
Container Size C = 3
How many kanban card sets are needed?
k = DL (1+S)/C =
= (5*2 *(1+0.5))/3 = 5