Wayne County will build an aqueduct to bring water in from the upper part of the
ID: 1213226 • Letter: W
Question
Wayne County will build an aqueduct to bring water in from the upper part of the state. It can be built at a reduced size now for $300 million and be enlarged 25 years hence for an additional $350 million. An alternative is to construct the full - s ized aqueduct now for $400 million. Both alternatives would provide the needed capacity for the 50 - year analysis period. Maintenance costs are small and may be ignored. At 6% interest, which alternative should be selected?
a.Do nothing
b.Two Stage Construction (reduced)
c.One Stage Construction (full)
Explanation / Answer
For two stage construction:
PW of cost = $300 million + $350 million (P/F,6%,25) = $350 million + $81.6 million = $381.6 million
For single stage construction:
PW of cos = $400 million
As present worth of cost of second stage construction is low hence it is more preferrable.
Option b is correct.