Identify 5 different ways to fund future transportation projects in California.

ID: 1711833 • Letter: I

Question

Identify 5 different ways to fund future transportation projects in California. * Explain the difference between High-Occupancy Vehicle (HOV) Lanes and High Occupancy Toll (HOT) Lanes Sketch a typical "Bridge and Overhead" structure. Explain what "Inverse Condemnation" means. . What are the FHWA designated ten controlling criteria for projects on the National Highway System (NHS)? Give three NH routes from San Diego County What is the name of the current federal law addressing surface transportation funding? Based on the RTP 2050 estimate the total hourly capacity of State Route 56 (SR-56) between I-15 and I-5 in 2050. Use the standard capacity ofa freeway lane and a capacity of 1,800 vph for a HOV/ML lane . Given the following information, estimate the number of lanes in each direction needed to obtain a level of service (LOS) C for a proposed new urban freeway: o ADT (2014) 110,000 ADT (2035) = 145,000 o DHV-11% ADT D = 60% V = 70 mph Lane capacity = 2,200 vph

Explanation / Answer

Hi,

The first question inn the sequence is solved due to contraints.

Thanks.

THe five different ways in which the transportation funding project in California can be done are:

1. Public Private Partnership.

2. State Infrastructure banks.

3. Federal funding .

4. Local option fuel taxes ( Special diesel Taxes)

5. Highway trust funds