Respond / critique this persons view on selecting the right equipment for a job

ID: 1866584 • Letter: R

Question

Respond / critique this persons view on selecting the right equipment for a job
Figuring out what equipment that is required at a job site will have to be figured out before th job starts. Visiting the site and looking at the A/E drawings will determine what the subcontractor will need at the jobsite. Regarding the roof, the subcontractor will have to check the contract on how material and equipment will be able to get up there, a site visit will come into play at that point. The subcontractor will be able to see how big of equipment will be able to fit onsite. Following up with their contract, the owner might provide a Lull that is big enough to get malarial on the roof. Depending on the size of the building there could be an elevator that is open to subcontractors. The roofer usually has to know what they are able to have on site because the equipment will be on the roof or outside in the parking lot.
Respond / critique this persons view on selecting the right equipment for a job
Figuring out what equipment that is required at a job site will have to be figured out before th job starts. Visiting the site and looking at the A/E drawings will determine what the subcontractor will need at the jobsite. Regarding the roof, the subcontractor will have to check the contract on how material and equipment will be able to get up there, a site visit will come into play at that point. The subcontractor will be able to see how big of equipment will be able to fit onsite. Following up with their contract, the owner might provide a Lull that is big enough to get malarial on the roof. Depending on the size of the building there could be an elevator that is open to subcontractors. The roofer usually has to know what they are able to have on site because the equipment will be on the roof or outside in the parking lot.

Figuring out what equipment that is required at a job site will have to be figured out before th job starts. Visiting the site and looking at the A/E drawings will determine what the subcontractor will need at the jobsite. Regarding the roof, the subcontractor will have to check the contract on how material and equipment will be able to get up there, a site visit will come into play at that point. The subcontractor will be able to see how big of equipment will be able to fit onsite. Following up with their contract, the owner might provide a Lull that is big enough to get malarial on the roof. Depending on the size of the building there could be an elevator that is open to subcontractors. The roofer usually has to know what they are able to have on site because the equipment will be on the roof or outside in the parking lot.

Explanation / Answer

Visiting the site and the A/E drawings is mandatory for the subcontractor to identify the materials required. A site visit for knowing the materials is mandatory but looking at the contract is not. After analysing the site and the type of materials and equipment required /efficient, the subcontractor could wait for the owner's call on the equipment or directly give a suggestion slip of the suitable equipment.to transfer materials on the roof. If at all a lull is provided and it is not suitable to the site condition, the subcontractor can lease the same and create a staffolds for the purpose to serve the materials.