CONSTRUCTION SITE FIRE SAFETY MANAGER TEST 14. A C of F holder for the operation of portable fueled when such heaters are in use. Which type of heater would not be space heaters is required to be present at all times A. Solid fuel Salamander subject to this requirement? B. Kerosene Fueled Salamander. C. Electrically heated ceramic radiators. D. LPG or Natural Gas Fueled Salamander 15. It is a Best Practice that the FDNY permit binder found in the First Responder Box, Includes permits such as flammable gases, combustible liquids and A. portable fueled space heaters B. paint, varnishes and lacquers C combustible gases D. portable electric heaters 16. It is Best Practice that the CSFSM inspects the standpipe syst em. Which of the following statement is INCORRECT? A. The OS & Y valve(s) shall be in the closed position and chained B. If the standp pipe system is not fully exposed, the CFSM will obtain schematic designs of the standpipe system and use them to facilitate his visual inspection. C. The CFSM will test the standpipe system alarm weekly by opening a valve (thereby breaching the pressurized system) and verifying that the alarm system sounds. D. The CFSM must conduct a daily visual inspection of the entire standpipe system from the top of the standpipe out to the Fire Department connections on the street level 17. A hot work permitfauthorization)should be prepared by thefor the subcontractor. A. Professional Engineer B. competent persorn C. Security Guard D. Fire Inspector 18. What method shall the certificate of fitness holder use to establish a safe zone behind the work area when powder actuated tools are used? A. Build a cinder block wall. B. Build a wall of at least % inch plywood. C. Build a wall of at least % inch fire rated plywood. D. Evacuate the area or placing a barrier constructed of inch steel plate. 19. It is a Best Practice for workers involved in hot work operations to receive orientation training and be retrained every A. 6 months B. 12 months C. one D. 4 months month Page 3

Explanation / Answer

14)

Answer (C) electrically heated ceramic radiators

15)

Answer (C) Combustible gases

17)

Answer (D) fire inspector

Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
Chat Now And Get Quote