Academic Integrity: tutoring, explanations, and feedback — we don’t complete graded work or submit on a student’s behalf.

E ELECT 1B0-Fr X hoolcraft.edu/webapps/assessment/take/launch,sp?ccusse assessme

ID: 2292170 • Letter: E

Question

E ELECT 1B0-Fr X hoolcraft.edu/webapps/assessment/take/launch,sp?ccusse assessment ud-170598 1&course.id16280; 1content.id-2520364 1teper here on the boolomarks bar. Import bookmarks ncw. Question Completion Status QUESTION 14 Multiple Choicel Which statement about a While Loop Is NOT true? A.?fthe Loop Condition is set to stop, the Whileloop wil never eeote. O & Two While Loops that do not have any dependencies wel operate in paralel. ? ? The iteration terminal Ois an i32 data type whose ntial value iso and ioremets by one amer each loop eeecut on e D. it the Loop Condition is ses to stop, the Whie Loop wil exeoute one time. QUESTION 15 (Mukiple Choice) What can a property node be used for? O A changes the data type of a ul element e B Allow Ll elements (controls and indiciators to be programmaticaly adjusted O CCreates new ul elements (controls or indicator 0 Q Inwokes a ul olement method or action jes: set to dsabled QUESTION 16 Multiple Choice) What is the difterence bstween a Graph and a chart A graphis for displayng meger data and chart is tor bodean data dspleging daa whilo it is being collected . C A chart is for anslying dats that has already been coflected and a graph is for deplayng osta whis it is beng collected o8 A graph is for analyzing data that has aready been coteced and a cht A graph is for showing temperature dats and a chat is for wohage data Chek Save and Submit to sqe and submit.Ciek Save Al Aers to ause ail anes Pace nsert

Explanation / Answer

14) while loop execute when condition is true. If condition is given to stop then it will not execute further. Two while loops can be run in parallel. Hence option D is correct.

15) Node property is used to programmatically controls the front panel properties such as changing colour, controls Indicator etc hence option B is correct.

16) Chart is basically used to analyse data which already present such as pie chart, but graph shows process which is in process. Hence option A and B is irrelevant. Therefore option C is correct.