Academic Integrity: tutoring, explanations, and feedback — we don’t complete graded work or submit on a student’s behalf.

I need to Prepare entries for a job order, cost system, and cost of goods manufa

ID: 2412693 • Letter: I

Question

I need to Prepare entries for a job order, cost system, and cost of goods manufactured schedule, but my numbers aren't matching up. Please answer both parts of the question.

Case Inc. is a construction company specializing in custom patios. The patios are constructed of concrete, brick, fiberglass, and lumber, depending upon customer preference. On June 1, 2017, the general ledger for Case Inc. contains the following data.

P15-3A Prepare entries for a job order cost system and cost of goods manufactured schedule Case Inc. is a construction company specializing in custom patios. The patios are constructed of concrete, brick, fiberglass, and lumber, depending upon customer preference. On June 1, 2017,   the general ledger for Case Inc. contains the following data. Raw Materials Inventory $4,200 Manufacturing Overhead Applied $32,640 Work in Process Inventory $5,540 Manufacturing Overhead Incurred $31,650 Subsidiary data for Work in Process Inventory on June 1 are as follows. Job Cost Sheets Customer Job Cost Element Rodgers Stevens Linton Direct materials $600 $800 $900 Direct labor             320                  540                 580 Manufacturing overhead             400                  675                 725 $1,320 $2,015 $2,205     During June, raw materials purchased on account were $4,900, and all wages were paid. Additional overhead costs consisted of depreciation on equipment $900 and miscellaneous costs of $400 incurred on account.     A summary of materials requisition slips and time tickets for June show the following. Customer Job Materials Requisition slips Time tickets Rodgers $         800 $850 Koss          2,000 800 Stevens             500 360 Linton          1,300 1,200 Rodgers             300 390          4,900 3,600 General use          1,500 1,200 $      6,400 $4,800     Overhead was charged to jobs at the same rate of $1.25 per dollar of direct labor cost. The patios for customers Rodgers, Stevens, and Linton were completed during June and sold for a total of $18,900. Each customer paid in full. Instructions (a) Journalize the June transactions: (1) for purchase of raw materials, factory labor costs incurred, and manufacturing overhead costs incurred; (2) assignment of direct materials, labor, and overhead to production; and (3) completion of jobs and sale of goods. (b) Post the entries to Work in Process Inventory. (c ) Reconcile the balance in Work in Process Inventory with the costs of unfinished jobs. (d) Prepare a cost of goods manufactured schedule for June. NOTE: Enter a number in cells requesting a value; enter either a number or a formula in cells with a "?" . (a)(1) Journalize the June transactions for purchase of raw materials, factory labor costs incurred, and manufacturing overhead costs incurred Raw Malerials Inventory Accounts Payable Factory Labor Cash Manufacturing Overhead Accumulated Depreciation- Equipment Accounts Payable (a)(2) Journalize the June transactions for assignment of direct materials, labor, and overhead to production Work in Pricess Inventory Manufacturing Overhead Raw Malerials Inventory Work in Pricess Inventory Manufacturing Overhead Factory Labor Work in Pricess Inventory Manufacturing Overhead (a)(3) Journalize the June transactions for completion of jobs and sale of goods. Finished Goods Inventory Work in Process Inventory Cash Sales Cost of Goods Sold Finished Goods Inventory (b) Post the entries to Work in Process Inventory. Work in Process Inventory 6/1 Balance June Completed work Direct Materials Direct labor Overhead applied 6/30 Balance (c ) Reconcile the balance in Work in Process Inventory with the costs of unfinished jobs. 6/30 balance in Work in Process Inventory Unfinished Job (Koss)      Direct materials      Direct labor      Manufacturing overhead (d) Prepare a cost of goods manufactured schedule for June. CASE INC. Cost of Goods Manufactured Schedule For the Month Ended June 30, 2017 Work in process, June 1 Direct materials used Direct labor Manufacturing overhead applied      Total manufacturing costs Total cost of work in process Less: Work in process, June 30     Cost of goods manufactured After you have completed P15-3A, consider the following additional question. 1. Assume that indirect labor and raw materials purchases changed to $1,400 and $6,800 respectively. Also assume that overhead is applied at the rate of $1.50 per dollar of direct labor. The three completed jobs were sold for $22,000 cash. Revise the journal entries to reflect these changes. ork in Process invento Tots coet of oork in prpcess Less: Wiork in ?lryuulti" ocrpickd Pisan.corasar that:brigaddicralquaaten

Explanation / Answer

Customer Job Beginning Bal Materials Requisition slips Time tickets D Overhead D*1.25 Total Completed Ending WIP Rodgers $1,320 800 $850 $1,063 $4,033 $4,033 Koss 2000 800 $1,000 $3,800 $3,800 Stevens 2015 500 360 $450 $3,325 $3,325 Linton 2205 1300 1,200 $1,500 $6,205 $6,205 Rodgers 300 390 $488 $1,178 $1,178 $5,540 $4,900 $3,600 $4,500 $18,540 $14,740 $3,800 Accounts Title Dr Cr a1 Raw Malerials Inventory $4,900 Accounts Payable $4,900 Factory labor $4,800 Cash $4,800 Manufacturing Overhead 1300 Accumulated Depreciation- Equipment 900 Accounts Payable 400 (a)(2) Work in Process Inventory 4900 Manufacturing Overhead 1500 Raw Malerials Inventory 6400 Work in Process Inventory 3600 Manufacturing Overhead 1200 Factory Labor 4800 Work in Process Inventory (3600*1.25) 4500 Manufacturing Overhead 4500 (a)(3) Finished Goods Inventory $14,740 Work in Process Inventory $14,740 ( Cash 18900 Sales 18900 Cost of Goods Sold $14,740 Finished Goods Inventory $14,740 (b) Work in Process Inventory 1-Jun Balance 5540 June Completed work $14,740 Direct Materials $4,900 Direct labor $3,600 Overhead applied $4,500 30-Jun Balance $3,800 (see from job cost sheet) (c ) 6/30 balance in Work in Process Inventory Unfinished Job (Koss)      Direct materials 2000      Direct labor 800      Manufacturing overhead 1000 3800 (d) CASE INC. Cost of Goods Manufactured Schedule For the Month Ended June 30, 2017 Work in process, June 1 5540 Direct materials used $4,900 Direct labor $3,600 Manufacturing overhead applied $4,500      Total manufacturing costs $13,000 Total cost of work in process $18,540 Less: Work in process, June 30 3800     Cost of goods manufactured $14,740 Changes Customer Job Beginning Bal Materials Requisition slips Time tickets D Overhead D*1.5 Total Completed Ending WIP Rodgers $1,320 800 $850 $1,275 $4,245 $4,245 Koss 2000 800 $1,200 $4,000 $4,000 Stevens 2015 500 360 $540 $3,415 $3,415 Linton 2205 1300 1,200 $1,800 $6,505 $6,505 Rodgers 300 390 $585 $1,275 $1,275 $5,540 $4,900 $3,600 $5,400 $19,440 $15,440 $4,000 a1 Dr Cr Raw Malerials Inventory $6,800 Accounts Payable $6,800 Factory labor (3600+1400) $5,000 Cash $5,000 Manufacturing Overhead 1300 Accumulated Depreciation- Equipment 900 Accounts Payable 400 (a)(2) Work in Process Inventory 4900 Manufacturing Overhead 1500 Raw Malerials Inventory 6400 Work in Process Inventory 3600 Manufacturing Overhead 1400 Factory Labor 5000 Work in Process Inventory (3600*1.5) 5400 Manufacturing Overhead 5400 (a)(3) Finished Goods Inventory $15,440 Work in Process Inventory $15,440 Cash 22000 Sales 22000 Cost of Goods Sold $15,440 Finished Goods Inventory $15,440 (b) Work in Process Inventory 1-Jun Balance 5540 June Completed work $15,440 Direct Materials 4900 Direct labor 3600 Overhead applied $5,400 30-Jun Balance $4,000 (see from job cost sheet) (c ) 6/30 balance in Work in Process Inventory Unfinished Job (Koss)      Direct materials 2000      Direct labor 800      Manufacturing overhead $1,200 4000 (d) CASE INC. Cost of Goods Manufactured Schedule For the Month Ended June 30, 2017 Work in process, June 1 5540 Direct materials used $4,900 Direct labor $3,600 Manufacturing overhead applied $5,400      Total manufacturing costs $13,900 Total cost of work in process $19,440 Less: Work in process, June 30 4000     Cost of goods manufactured $15,440

Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
Chat Now And Get Quote