2,500 1. what is the compaines plant wide overhead rate. 2. What is the activity
ID: 2423702 • Letter: 2
Question
2,500
1. what is the compaines plant wide overhead rate.
2. What is the activity rate for the Machining activity cost pool
3. What is the activity rate for the Machine Setups activity cost pool pre set up
4.
Activity Cost Pool Activity Measure Estimated Overhead Cost Expected Activity Machining Machine-hours $ 203,000 10,000 MHs Machine setups Number of setups $ 121,900 230 setups Production design Number of products $ 87,000 2 products General factory Direct labor-hours $ 379,500 12,000 DLHsExplanation / Answer
Activity Cost Pool Activity Measure Estimated Overhead Cost Expected Activity Activity rate Activity Measure Product Y OH of Y Product Z OH of Z Machining Machine-hours $ 203000 10000.00 MHs 20.3 Machine-hours 7,300 1,48,190 2,700 54,810 Machine setups Number of setups $ 121900 230.00 setups 530 Number of setups 50 26,500 180 95,400 Production design Number of products $ 87,000 2.00 products 43500 Number of products 1 43,500 1 43,500 General factory Direct labor-hours $ 379,500 12000.00 DLHs 31.625 Direct labor-hours 9,500 3,00,438 2,500 79,063 1 Companies plantwise Overhead rate = Estimated OH / Expected activity = 379500/12000 = $ 31.625/ Labour hour 2 Activity rate for the Machining activity cost pool= OH/ Machine Hrs =203000/10000 =20.3 3 Activity rate for the Machine Setups activity cost pool pre set up = OH/ No Of setups = 121900/230 = 530 4 Activity rate for the Product Design activity cost pool per product = OH/ No of Products = 87000/2 = 43500
Related Questions
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.