As of the end of June, the job cost sheets at Racing Wheels, Inc., show the foll

ID: 2464889 • Letter: A

Question

As of the end of June, the job cost sheets at Racing Wheels, Inc., show the following total costs accumulated on three custom jobs.

  

Job 102

Job 103

Job 104

  Direct materials

$ 32,000

$ 54,000  

$ 62,000  

  Direct labor

13,000

26,600  

40,000

  Overhead

6,240

12,768  

19,200

  

Job 102 was started in production in May and the following costs were assigned to it in May: direct materials, $10,000; direct labor, $3,300; and overhead, $1,584. Jobs 103 and 104 are started in June. Overhead cost is applied with a predetermined rate based on direct labor cost. Jobs 102 and 103 are finished in June, and Job 104 is expected to be finished in July. No raw materials are used indirectly in June. Using this information, answer the following questions. (Assume this company’s predetermined overhead rate did not change across these months).

  

1&2.

Complete the given below table to calculate the cost of the raw materials requisitioned and direct labor cost incurred during June for each of the three jobs?

Direct Materials:

Job

May

June

Total

102

103

104

Total

Direct Labor:

Job

May

June

Total

102

103

104

Total

3. What predetermined overhead rate is used for Job 102?

Overhead Rate

Choose Numerator:

/

Choose Denominator:

=

Overhead Rate

/

=

Overhead Rate

/

=

4. How much total cost is transferred to finished goods during June?

Job

Direct Material

Direct Labor

Applied Overhead

Total Cost

Cost Transferred to Finished Goods

102

$32,000

$13,000

103

54,000

26,600

104

62,000

40,000

Total

$148,000

$79,600

As of the end of June, the job cost sheets at Racing Wheels, Inc., show the following total costs accumulated on three custom jobs.

Explanation / Answer

Answer: 1

Direct Materials:

Job

May

June

Total

102

10000

32000 - 10000 = 22000

32000

103

54000

54000

104

62000

62000

Total

138000

148000

Answer:2

Direct Labor:

Job

May

June

Total

102

3300

13000-3300 = 9700

13000

103

26600

104

40000

Total

76300

79600

Answer:3

Overhead Rate

Choose Numerator:

/

Choose Denominator:

=

Overhead Rate

6240

/

16000

=

Overhead Rate

6240

/

16000

=

39%

Answer:4

Direct Materials:

Job

May

June

Total

102

10000

32000 - 10000 = 22000

32000

103

54000

54000

104

62000

62000

Total

138000

148000