The Quality Control Department employs fivetechnicians during the day shift. Lis
ID: 2916269 • Letter: T
Question
The Quality Control Department employs fivetechnicians during the day shift. Listed below is the number oftimes each technician instructed the production foreman to shutdown the manufacturing process last week.
Technician
Shutdowns
Taylor
4
Hurley
3
Gupta
5
Rousche
3
Huang
2
a. How many different samples oftwo technicians are possible from this population?
b. List all possible samples oftwo observations each and compute the mean of each sample.
c. Compare the mean of the samplemeans with the population mean.
d. Compare the shape of thepopulation distribution with the shape of the distribution of thesample means.
Technician
Shutdowns
Taylor
4
Hurley
3
Gupta
5
Rousche
3
Huang
2
Explanation / Answer
A) There are C(5, 2) ways of selecting 2 people from a group of5. C(5, 2) = 10 B) Let T be Taylor, H be Hurley, G be Gupta, R be Rousche, and U beHuang. TH = 3.5 TG = 4.5 TR = 3.5 TU = 3 HG = 4 HR = 3 HU = 2.5 GR = 4 GU = 3.5 RU = 2.5 C) Population Mean = (4 + 3 + 5 + 3 + 2) / 5 = 3.4 Sample means = (3.5 + 4.5 + 3.5 + 3 + 4 + 3 + 2.5 + 4 + 3.5 + 2.5)/ 10 = 3.4 They're the same!
Related Questions
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.