An energy company is proposing to erect wind turbines im your community. The company puts up test towers to measure normal wind conditions. The actual turbines require a wind speed of at least 5 m/s and reach optimal power output when the wind speed is 15m/s/ If the wind speed is more than 25m/s, the turbines are shut down to prevent damage. The test towers recorded an average wind speed of 13m/s with a standard deviation of 3.9m/s.

a) What is the probability that the wind will blow within 3m/s of the optimum wind speed?

b) What is the probability that the wind will blow hard enough to require the turbines to shut down?

Explanation / Answer

a) as within 3m/s of the optimum wind speeds are 12 and 18 m/s

b)

probability that the wind will blow hard enough to require the turbines to shut down

for normal distribution z score =(X-)/ here mean=       = 13.000 std deviation   == 3.90