1. The cross section of a salt storage building is Roof shown below. At least 10
ID: 3113892 • Letter: 1
Question
1. The cross section of a salt storage building is Roof shown below. At least 1000 ft3 of salt is to be stored per foot of length of the building. The cost of the building per foot length can be characterized by: Roof-3s, walls = 2H2 each, and Floor-5s. In formulating your problem, you can neglect the costs associated with the end of the building. If the objective is to minimize the cost of the building per unit volume of salt stored: 6' min. Wall 30° Floor SALT Width S a) Identify the design variables you will use in (20 mip. 60 max) formulating the problem b) Create an objective function that minimizes the cost of the structure c) Write out the relevant constraints d) Put the problem into standard form (with normalized constraints)
Explanation / Answer
Kindly refer to the file attached for detailed solution for detailed solution. This needs variables and objective function construction
Related Questions
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.