Academic Integrity: tutoring, explanations, and feedback — we don’t complete graded work or submit on a student’s behalf.

An accountant wishes to predict direct labor cost (y) on the basis of the Batch

ID: 3158620 • Letter: A

Question

An accountant wishes to predict direct labor cost (y) on the basis of the Batch size (x) of a product produced in a job shop. Data for 12 production runs are given in the table below, along with the Excel output from fitting a least squares regression line to the data. Find b_1 and b_0. (Round your answers to 4 decimal places.) Interpret the meanings of b_0 and b_1. Does the interpretation of b_0 make practical sense? Write the least squares prediction equation. (Round your answers to 4 decimal places.) Use the least squares line to obtain a point estimate of the mean direct labor cost for all batches of size 60 and a point prediction of the direct labor cost for an individual batch of size 60. (Round your answer to 3 decimal places.)

Explanation / Answer

a) b1=10.1463 b0=18.488

b) b1 is estimated increase in Labor Cost for every 1 unit increase in B size

b0 is estimated labor cost when Bsize=0

c) Lease square regression y=18.488+10.1463x

d)For batch size 60 the labor cost will be 627.266 hunders of dollars

Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
Chat Now And Get Quote