Circle the right answer from the Options given below. 1 - The time estimate in P
ID: 3158648 • Letter: C
Question
Circle the right answer from the Options given below.
1 - The time estimate in PERT follow the
a. Normal distribution. b. Poisson distribution.
c. Beta distribution. d. Binomial distribution.
2 - Which of the following quantity is not needed for each activity in the critical
path?
a. Earliest start time b. Earliest finish time
c. Latest finish time. d. Pessimistic time.
3 - Which of the following is not considered as one of the step in PERT/CPM
a. Activity time follows Poisson distribution.
b. Develop the relationship among the activities.
c. Assign the time and (or) cost estimate to each activity.
d. Draw the network connecting all of the activities.
4 - If the simulation is repeated thousand time, it is much more likely that
a. Average simulation demand will be two times the expected demand.
b. Average simulation demand will nearly the same as the expected demand.
c. Average simulation demand will be half of the expected demand.
d. All the above.
5- The disadvantage of simulation is
a. Time compression is possible with simulation.
b. It allow us to study the interaction effect of individual components to determine which
one are important.
c. Each simulation model is unique.
d. It does not interfere with the real world system.
Explanation / Answer
The correct option are bolded.
1 - The time estimate in PERT follow the
a. Normal distribution. b. Poisson distribution.
c. Beta distribution. d. Binomial distribution.
2 - Which of the following quantity is not needed for each activity in the critical
path?
a. Earliest start time b. Earliest finish time
c. Latest finish time. d. Pessimistic time.
3 - Which of the following is not considered as one of the step in PERT/CPM
a. Activity time follows Poisson distribution.
b. Develop the relationship among the activities.
c. Assign the time and (or) cost estimate to each activity.
d. Draw the network connecting all of the activities.
4 - If the simulation is repeated thousand time, it is much more likely that
a. Average simulation demand will be two times the expected demand.
b. Average simulation demand will nearly the same as the expected demand.
c. Average simulation demand will be half of the expected demand.
d. All the above.
5- The disadvantage of simulation is
a. Time compression is possible with simulation.
b. It allow us to study the interaction effect of individual components to determine which one are important.
c. Each simulation model is unique.
d. It does not interfere with the real world system.
Related Questions