QUESTION 11 A project involves components where the hardware needs minor redesig
ID: 3184804 • Letter: Q
Question
QUESTION 11 A project involves components where the hardware needs minor redesign, and has significant complexsity, software is sate of the art, and moderateby complex; and the performance depends on new system. The two hardware based weights are estimated as 0.17 each are estimated as 0.25 each. Based on this information, the value for CLF is (show your number with only two decimal places es 030 ar while the two software based weights QUESTION 12 1 points ae The earned value of a project is the O None of these are correct @ Percent of the original budget that has been earned by actual work Cost incurred minus the planned cost Project cost to date adjusted for project scope changes Total project cost to date Save QUESTION 13 Refer to the following network diagram Assuming that you have three resources, use the heurstics methoddsussed thiss ndpdoudledsotn Indicated the order in which activities are scheduledExplanation / Answer
11) Types 2: Equal component of Hardware and software
Thus weightage for each is 0.5
CLF = 0.5 (0.17) + 0.5 (0.25) = 0.21
12) Earned value of a project is the
Percent of the original budget that has been earned by actual wok
Take the actual percentage of the completed work and multiply it by the project budget and you will get the Earned Value.
Earned Value = % of completed work X BAC (Budget at Completion)
Related Questions
Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.