Teacher instructions below. g- Assume Tolerance limit of 25t1.50 lbs. is specifi
ID: 3228555 • Letter: T
Question
Teacher instructions below. g- Assume Tolerance limit of 25t1.50 lbs. is specified in the sales contract and find the Process capability index Cpk. Explain what it indicates and if process is capable to meet contractual agreement 25-1.50 23.5 STANDAR DEVIATION .58 25+1.50 26.5 X-BAR- 24.54 CP USL-LSL/6(R/D2) (CP) 23.5-26.5/6 .58 8620 (CPLI24. 54-23.5/3 .58 5977- .60 CPL X-LSL/3(R/D2) CPU- USL-X/3 (R/D2) (CPU 26.5-24.54/3 .58- 1.126 1.13 CPK-MIN PL, CPU) (CPK) MINO 60.1.13) (.60,1.13) This process is not capable because it is not at or above 1.33 h- Redo part g for all three shifts separately and determine their Cpk. Note that you must find mean and standard deviation for each shift separately. Morning shift SD 19 (CPL 25.15 23.5/3*.19- 2.89 (CPU) 26.5-25.15/3*.19- 2.37 (CPK) (2.89,2.37) Afternoon shift SD 2.17 (CPL 24.62-23.5/3 2.17 17 (CPU) 26.5 24.62/3 2.17 .29 (CPK) (.17.29) Night shift SD .31 (CPL) 23.86-23.5/3*.31 39 (CPU 26.5-23.86/3 .31 2.84 (CPK) (.39,2.84)
Explanation / Answer
in g part all calculations and formulas are correct except you wrote for Process capability that
Cp = 23.5-26.5/6*0.58 = -0.8620
This is wrong
The correct Cp is
Cp = 26.5-23.5/6*0.58 = 0.8620
Rest are correct
Related Questions
Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.