a)A regeneration survey has indicated that 85 of the 110 plots examined were sto
ID: 3260823 • Letter: A
Question
a)A regeneration survey has indicated that 85 of the 110 plots examined were stocked. If the requirement is 80% stocking for satisfactory regeneration, would you call this area as "satisfactory"? Use = 0.01. b)Another survey from another area indicated 84% stocking from 100 plots. Is this area different from the area described in Question (a)? Use = 0.05. If the germination capacity of a seed lot is at least 70%, it is acceptable for a nursery. A test of a given seed lot showed that 8 out of 18 seeds germinated. Would you accept this seed lot? Use = 0.05 (or as close as possible).
Explanation / Answer
Answer to part a)
Sample proportion P^ = 85/110 = 0.7727
Population Proportion P = 0.80
n = 110
.
SE = sqrt(P*Q/n)
SE = sqrt(0.80 *0.20 /110)
SE = 0.03814
.
Formula of Test Statistic
Z = (P^-P) / SE
Z = (0.7727 - 0.80) / 0.03814
Z = -0.72
.
The P value for this is : 0.2358
.
Since the P value is greater than alpha 0.01 , we conclude this area to be satisfactory
.
Answer to part b)
Z = (0.84 - 0.80) / 0.03814
Z = 1.05
.
The P value is 0.1469
.
Since the P value is greater than alpha 0.05 , we conclude this area to be satisfactory
.
Answer to part c)
The P^ = 8/18 = 0.44
P = 0.70
n = 18
.
SE = sqrt(0.70*0.30/18)
SE = 0.1080
.
Z = (0.4444 - 0.70) / 0.1080
Z = -2.37
.
The P value is : 0.0089
.
Since the P value 0.0089 < 0.05 , we fail to accept this lot