Academic Integrity: tutoring, explanations, and feedback — we don’t complete graded work or submit on a student’s behalf.

Sentence Clarity Improve the clarity of the following sentences by changing sent

ID: 3270159 • Letter: S

Question

Sentence Clarity Improve the clarity of the following sentences by changing sentence structures or by splitting long sentences into several shorter ones.

Therefore, to collect a sample from above the water table, and thus to follow the directions provided by the client, the initial boring was abandoned and the drill rig was repositioned about two feet away and a new boring was drilled.

New Sentence(s):

After capping the soil sample ring with PVC end caps and then notifying all members of the project team, we placed it in a cooler for storage on-site and transportation later to a chemical analytical laboratory.

New Sentence(s):

Based on the geotechnical data obtained from the subsurface exploration program, the results of the percolation testing, and the planned plumbing fixtures, the feasibility of installing a leachfield-type on-site sewage-disposal system was evaluated.

New Sentence(s):

Percolation test #1 was performed approximately 40 feet east of the existing pump house and percolation test #2 was performed near the base of the slope approximately 65 feet west of the pump house, and then the results were submitted to the builder.

New Sentence(s):

We appreciate the opportunity to provide our services on this project and look forward to continuing our relationship with XYZ Trading and Transportation Company when we begin the Zanter Project with your Finance Department next spring.

New Sentence(s):

Explanation / Answer

(A)sample above the water table was collected , and client directions was followed, the initial boring was abandoned and the drill rig was repositions about two feet away and a new boring was drilled.

(B)After capping the soil sample ring with PVC end caps and then notifying all memebers of the project team, we placed it in a cooler for storage on-site and transportation later to a chemcial analytical labortory.


(C) capping the soil sample ring with PVC end caps and notifying all memebers of the project team, it was placed in a cooler for storage on-site and later transported to a chemcial analytical labortory.


(D)on-site leachfield type sewage-dispoal system was evaluated on basis of geotechnical data obtatined from the subsurface exploration program,results of the percolation testing, and the planned plumbing fixtures.

Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
Chat Now And Get Quote