Consider a process consisting of three resources. Assume there exists unlimited
ID: 343086 • Letter: C
Question
Consider a process consisting of three resources. Assume there exists unlimited demand for the product. Resource 1 has a processing time of 2 minutes per unit. Resource 2 has a processing time of 6 minutes per unit. Resource 3 has a processing time of 4 minutes per unit. Resource 1 Resource 2 Resource 3 All three resources are staffed by one worker. The flow diagram is shown above. Round "Capacity of resource" to 3 decimal places and other numbers to whole numbers units per minute a. What is the capacity of resource 2? b. What is the bottleneck in the process? c. What is the utilization of resource 2? Resource percent How long does it take the process to produce 182 units starting with an empty system, assuming this is a worker-paced process? minutesExplanation / Answer
Hello! Hope this answer help! Please do thumbs up and comment if you need any help!
a)Capacity = 1/processing time
Capacity of Resource 2 = 1/6 = .1667 units per minute
b) The bottleneck is defined as the process in the flow diagram with the lowest capacity (the “weakest link”).
Therefore, the process with the highest processing time is the bottleneck i.e RESOURCE 2
c) Utilisation = Flow Rate/Capacity
= 1/6*100
=16.667%
d) One unit takes LCM(2,6,4) minutes to process
One unit takes 12 minutes
182 units => 182*12
=2184 minutes
Related Questions
Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.