ENGLISH: Revise the following sentences by correcting the grammatical inconsiste
ID: 3500250 • Letter: E
Question
ENGLISH: Revise the following sentences by correcting the grammatical inconsistencies.
1. The main supply generator's armature windings burned all of the laboratory's electronic instruments were affected.
2. After disturbing the membrane's surface tension.
3. You'll find the list of software specifications beginning on page 3, you'll also find on page 3 a note about our current hardware configuration.
4. The density of the kelp and formation of the coral reef near the northeastern leg of the platform does not provide the abalone adequate protection from drilling debris.
5. What is the origin and purpose of this procedure?
6. The Board of Directors is meeting now. They are trying to decide upon a new location for the plant.
7. To test the reliability of the program, three lines must be added to the initial set of instructions.
8. The study was conducted last week, providing insight into the unique needs of a disabled child's family.
9. The new networking system, which was modified from our current LAN and will be installed next week.
10. According to OSHA rules, and good common sense, each of the engineers should wear their safety glasses and hard hats when they enter the mine.
11. Under normal conditions, the power unit would take at least four days to repair, however, with six additional technicians and a complete shut-down during the third shift, I can have the unit up again by noon tomorrow.
12. Boatbuilders from Maine to Georgia have made Pliostic their first choice in wood bonding agents, we are sure that you, too, will see the advantages of these improvements.
13. These procedures must be followed on all leased HVAC equipment, after receiving work orders through the proper channels.
14. After testing the sand for oil a third time, the decision was made to abandon the drilling site.
15. If anyone finds a particle ratio larger than 500,000 to 1, they are to notify the Safety Department immediately.
16. Your technicians simply attach the pieces with the use of one small set screw, and they are ready to operate.
17. Neither of the atmospheric pressure gauges were functioning properly.
18. The new equipment will not be subject to as many breakdowns as the old auger system, this will eliminate lost production time and wages.
19. Each of the resistors were cold-soldered to their respective boards, almost missed by the automatic self-testing feature.
20. With the right equipment and materials, the waste water reservoir pump again will be operating as it should.
21. Results of the membrane permeability tests and the possibility of adding another polymer to the solution was also discussed.
22. By switching off the internal sensor manually, the aircraft will maintain its climb without faltering.
23. According to standard safety procedures, protective clothing is tested by everyone before they enter the contaminated area.
24. Because worn bearings cause rollers to stick.
25. Data are analyzed by project scientists once it is gathered.
Explanation / Answer
1. All laboratory electronic instrument are affected while The main supply generator's armature winding burned .
3.if it is disturbed , then the memberane surface tension occurred.
5.what kind origin and purpose have of this procudure???
6.Now Board of director meeting has organized . They are trying to find out location for plant through collective discussion.
7.Three lines must be added to the initial set of instructions.Therfore, we can test the reliablity program.
8. Last weak , a study was conducted .The main objective of study was to providing insight into unique needs of disabled child's family.
9.The new networking system was modified through our current LAN.It will be install in next week.
25. A project sceientist firstly gathered the data . After that he analyzed it.
Related Questions
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.