As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material for a bracket that is made up of a base, 1 spring, and 4 clamps. The base is assembled from 1 clamp and 2 housings. Each clamp has 1 handle and 2 castings. Each housing has 2 bearings and 2 shafts. There is no inventory on hand. a) Design a product structure noting the quantities for each item and show the low-level coding. Match each number in the structure below with the corresponding item Bracket Number Item Spring1) IlI Casting(2) Base) Clamp(4) Clamp(1) Handle(a) IIVH III Bearing(2) Handle

Explanation / Answer

Case 1

Case 2

Bracket

Total

After 25 Base removed

50 Clamp removed from Base and 50 from Bracket

0 Clamp removed from Base and 100 from Bracket

Base

75

50

50

50

Spring

75

75

75

75

Clamp

375

350

250

250

Housing

150

100

100

100

Handle

375

350

100

250

Casting

750

700

500

500

Bearing

300

100

100

100

Shaft

300

100

100

100

Case 1 seems to be the most voable option since lesser total material is required.

Case 1

Case 2

Bracket

Total

After 25 Base removed

50 Clamp removed from Base and 50 from Bracket

0 Clamp removed from Base and 100 from Bracket

Base

75

50

50

50

Spring

75

75

75

75

Clamp

375

350

250

250

Housing

150

100

100

100

Handle

375

350

100

250

Casting

750

700

500

500

Bearing

300

100

100

100

Shaft

300

100

100

100