As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material for a bracket that is made up of a base, 1 spring, and 3 clamps. The base is assembled from 2 clamps and 2 housings. Each clamp has 1 handle and 2 castings. Each housing has 1 bearing and 2 shafts. There is no inventory on hand a) Design a product structure noting the quantities for each item and show the low-level coding. Match each number in the structure below with the corresponding item. Bracket Item Spring(1) Housing(2) Casting(2) Number Base IV | Shaft Clamp(3) Clamp(2) Handle, 1) | | Casting 2 Handle() III Bearing) Enter your answer in the edit fields and then click Check Answer.Explanation / Answer
b)
Base : 150 units
Spring : 150 units
Clamp : 150*3 {for Bracket} + 150*2{ for Base} = 750 units
Housing : 150*2 = 300 units
Handle : 750*1 = 750 units
Casting : 750*2 = 1500 units
Bearing : 300*1 = 300 units
Shaft : 300*2 = 600 units
c)
Base : 150-25 = 125 units
Spring : 150 units
Clamp : 150*3+125*2 -100 = 600 units
Housing : 125*2 = 250 units
Handle: 600*1 = 600 units
Casting: 600*2 = 1200 units
Bearing : 250*1 = 250 units
Shaft : 250*2 = 500 units
Related Questions
Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.