You are designing an embedded system using an Intel Atom as a host. Does it make
ID: 3699881 • Letter: Y
Question
You are designing an embedded system using an Intel Atom as a host. Does it make sense to add an accelerator to implement the function z ax by +c? Explain You are designing an embedded system using an embedded processor with no floating-point support as host. Does it make sense to add an accelerator to implement the floating-point function S-A sin(2 f + ?)? Explain. 0-6 Find the longest path through the graph below, using the computation times on the nodes and the communication times on the edges PI P2 P3 P4 PSExplanation / Answer
The longest path problem in a graph is problem wherein you find the simple path which has a maximum distance in the given graph.
Basically the problem of finding the longest path is NP - hard because of the graph has cycles,we keep traversing the same edges again and again in an attempt to find the path with the longest distance.
But, from the above mentioned graph, it can be seen that the path -
P1 -> P3 - > P4 -> P5 is the longest path with the value of 5.
Related Questions
Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.