Answer:- Using software tools to report project information can lead to problems
ID: 373799 • Letter: A
Question
Answer:-
Using software tools to report project information can lead to problems with control. Here is summary of these problems:-
First, the system and software under test might behave differently during the testing than during the operation. This might result in test tools and environments problems. In this case, using the software tools to report project information can lead to problems with control because of a tendency to behave differently during the testing
Second, using software tools to report project information can lead to problems with control of the existence of unspecified testing and tracing requirements. Often times, the software requirements are ambiguous, missing, unstable or incorrect. This may result in issues with the software testing.
Third, using software tools to report project information can lead to problems with control because of the management testing problems. Inadequate supply of adequate tests and resources can result in issues associated with testing.
Fourth, using software tools to report project information can lead to problems with control of test planning and scheduling problems in the systems.
Explanation / Answer
How might using software tools to report project information lead to problems with control?
Related Questions
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.